Sunday, October 12, 2008

Bathroom Update

We're finally making more progress on the bathroom, so we thought we should share a few pics of how that is going. We've got most of the walls and floors prepared for the final covering (except in the shower area). This meant a lot of joint compound and sanding, as well as a bunch of hardibacker for the floor and some walls.

Here's a shot of the wall that we'll cover with slate, next to to the tub.
Here's the stairs with almost all of their hardibacker on.The last two weekends we've spent time cutting the slate from 12 x 12 down to about 2 x 12 to put it on the wall. Its a long process when there's 30 some boxes of slate. Here's some shots of some of the slate drying on the driveway and then stored in the garage.
Friday this week the plumbers came back and fixed the shower pan. Now we just have to hope that we pass the city inspection on tuesday. If so, then we'll be able to start putting the wall back together in the shower (cool!)